Facebook LinkedIn

COVID-19 INFO

320-587-0991

Start your Quote Online CONTACT US

  • Home
  • Request Quote
  • Commercial
    • Heating & Air Conditioning
    • Ventillation
    • Commercial Refrigeration
    • Large Burners
    • Commercial Kitchen
    • Commercial Remodels
    • Process Piping
    • Commercial Plumbing
    • Computer Room Cooling
  • Residential
    • Heating & Air Conditioning
    • Indoor Air Quality
    • Plumbing
    • Water Conditioning
    • Remodels
  • About Us
    • About Us
    • Testimonials
    • Commercial Project Gallery
    • Service Area
  • Key Concepts
    • Why Choose AEM?
    • Why Is Annual Maintenance Important?
    • Arsenic Contamination
    • Carbon Monoxide
    • Safety Recalls
    • AEM Blog Post Archive
    • WiFi Enabled Thermostats
Categories
Tags
Authors
Teams
Archives
Calendar
Subscribe to blog
Unsubscribe from blog
Settings
Sign In
  • Forget Username
  • Reset Password
Font size: + –
Subscribe to this blog post Unsubscribe
Print

Recommendations For Designing A New Commercial Facility

HVAC Commercial New Construction
Marty Wegner
Wednesday, 06 September 2017
2009 Hits
0 Comments

New commercial construction. Bring AEM Mechanical Services into the planning process early to help make your project a success.Forward Thinking While Planning Will Save Money And Resources

If you are looking to begin an expansion on an existing facility or building new, consider all aspects of your new building simultaneously. Planing in advance offers you the opportunity to better utilize space, resources and ultimately save you money. Let's take a  look at preplainning in relationship to your HVAC needs. Some things you will want to take into consideration are . . .

  • Various weather conditions experienced at your location.
  • Facility load variations as a result of production or occupancy.
  • Plan for future expansion.

Heating, ventilation and air-conditioning (HVAC Systems) account for 39% of the energy used in commercial buildings in the United States. As a business owner you need to maximize savings potential with your HVAC system to boost your bottom line.

Some Basic Information On Energy & Resource Efficient HVAC Design

The whole building design

You need to consider all aspects of your building as early in the design process as possible. Size, shape, building materials, work flow, equipment, lighting and HVAC equipment impact each other in maintaining the quality of the air inside your facility. It can be a very complicated mix to master that requires inclusion of a highly qualified HVAC company, such as AEM Mechanical Services, Inc.

Determine your design goals early

Do you want to save money on construction, or better prepare yourself for the future and realize greater savings over time? A building built simply to code will cost significantly more in energy use.

Invest in the appropriate size HVAC system

Installing an oversized system to accommodate possible future expansion is inefficient and will cost you more in equipment costs, energy efficiency and quality of air within your facility. An oversized cooling system may not dehumidify the air effectively, resulting in cool but "clammy" air.

When laying out space for your HVAC equipment you should allow empty space to accommodate expansion down the road. That way when you are replacing or adding to existing equipment you have the space required without adding the cost of additional construction or remodeling.

Establish an Operations & Maintenance Program

When designing your HVAC system for your new facility, make certain that you design the system to operate efficiently at the level of maintenance you are prepared to provide. You need to communicate with your HVAC design team and make sure you understand, and are committed to, a regular system of maintenance to ensure peak efficiency and longevity of your HVAC equipment.

Any new commercial construction project you are considering will go smoother, cost less and produce the maximum result when you bring your design teams together early in the process.

Call AEM Mechanical Services, Inc.,  at 320-587-0991 and put us to work on your new commercial building construction project.

 

Fall Heating Issues . . . Is There Such a Thing?
Common HVAC Issues In Large Facilities

About the author

Marty Wegner

Marty Wegner

Author's recent posts
More posts from author
Monday, 28 May 2018 Hail Damage to Your Central Air Unit
Tuesday, 15 May 2018 Summer, We Are A Go!
Friday, 27 April 2018 Commercial Rooftop Air Conditioner - Repair or Replace?
 

Comments

Already Registered? Login Here
No comments made yet. Be the first to submit a comment

2008 - 2020 © AEM Mechanical Services, Inc. - all rights reserved
MN License #34376PM
Privacy Policy | Sitemap
Website created by Mid Minnesota Marketing